Blakebrook Public School.
Fast facts:
Existing School Habitable flood level: Ground floor
2022 Flood level: 17.4m AHD
Flood depth on site: 2.2m
Habitable flood level: 19.2 AHD (4m above ground)
Flood resilience level: PMF (18.38m AHD)
Flood evacuation time: Under 6 hours
Planning pathway: Reconstruction Authority
Funding: iCare Insurance
In 2022, severe floods struck Northern NSW, causing significant damage to Blakebrook Public School and deeply affecting its community.
Building for the Future:
Elevated 4 meters above ground on a steel structure, designed to exceed worst-case flood scenarios
Flood-resistant materials and flexible spaces on the ground floor to ensure quick recovery
Upgraded infrastructure, including fire safety systems and sustainable features
A Renewed Learning Environment:
Three bright, technology-equipped classrooms,
A refreshed library and learning hub
A more efficient administration area
A canteen space designed to serve the school and community