Blakebrook Public School.

Fast facts:

Existing School Habitable flood level: Ground floor

2022 Flood level: 17.4m AHD

Flood depth on site: 2.2m

Habitable flood level: 19.2 AHD (4m above ground)

Flood resilience level: PMF (18.38m AHD)

Flood evacuation time: Under 6 hours

Planning pathway: Reconstruction Authority

Funding: iCare Insurance

In 2022, severe floods struck Northern NSW, causing significant damage to Blakebrook Public School and deeply affecting its community.

Building for the Future:

  • Elevated 4 meters above ground on a steel structure, designed to exceed worst-case flood scenarios

  • Flood-resistant materials and flexible spaces on the ground floor to ensure quick recovery

  • Upgraded infrastructure, including fire safety systems and sustainable features

A Renewed Learning Environment:

  • Three bright, technology-equipped classrooms,

  • A refreshed library and learning hub

  • A more efficient administration area

  • A canteen space designed to serve the school and community